27th August 2021
As you can see from our latest Ariel photo, Siddington Park is really coming together now. We can't wait to keep seeing this beautifully village develop.
Showhome now open!
5th July 2021
Our first showhome at Siddington Park is now open! The interior schemes within the showhomes at Siddington Park reflect a fine balance between traditional and contemporary living. Decorated by interior designer Rebekah Jones of Ombré Interior Design Ltd.
A bird's eye view
8th March 2021
A bird's eye view of our progress at Siddington Park. It is coming along nicely. Construction of all buildings now commenced and all is on programme. Well done team Rydon.
Its all happening on site
8th February 2021
Our Siddington Park Village site is progressing nicely
Roof nearly complete on Aspen Grange (left foreground) and Juniper Grange (left background, just visible through the fog).
The Pavilion central facility's ground floor blockwork almost complete.
Beautiful buildings revealed
30th January 2021
Beech Grange and Cedar Grange were revealed when the hoarding was removed today.
Looking stunning even in the damp weather.
First roof completed
11th December 2020
The roof of the first building at Siddington Park, Beech Grange (middle foreground), is now complete.
Looking forward to the scaffolding coming down.
Construction going well
11th November 2020
First floor blockwork completed on Beech Grange and Aspen Grange and the roof trusses are being installed on Beech Grange.
Not long before The Pavilion blockwork commences.
3D Model delivered
5th October 2020
Fabulous to be able to see the plans come to life in the 3D model, showing how everything connects with The Pavilion, the hub of the village's amenities and social activities.
Marketing Suite now open
25th September 2020
Our Siddington Park Retirement Village Marketing Suite is now open to visitors.
Priority reservations are open to those from the local area until 31st December 20.
Call our Sales Advisor, Rose, to arrange a visit and find out more.
Tree Planting Ceremony
24th September 2020
The Mayor of Cirencester, Councillor Patrick Coleman, planted a tree to mark the opening of our Siddington Park Marketing Suite.
A lot has happened in a month
28th August 2020
Ground floor almost complete for Aspen Grange (right of tree copse).
Foundations started for The Pavilion (foreground).
Marketing suite cabin delivered (middle background).
Village entrance wall 50% complete.
Construction has started
1st August 2020
First of the foundations have been poured, ground floor slabs laid and balcony steelwork erected.
Construction is ramping up.
Site set-up well underway
24th April 2020
Siddington Park site set-up is well underway. Its looking very neat and well organised. Well done to the Rydon team.
First Concept CGIs